- All 100 municipalities
- Free, answer in one minute
- Architects in Bertrange
Planning documents
Who to contact
Procedures
- Any construction, extension, façade change or change of use needs a building permit from the mayor before work starts.
- The application usually includes a cadastral plan extract, a site plan and the project drawings by an OAI-registered architect, plus an energy performance certificate for a new build or an extension.
- For a building from before 2001, have an asbestos survey done before demolition. For Klimabonus grants, involve an energy adviser before the works.
- Buildings with 3 or more dwellings, offices or shops: ITM (ITM-SST 1500 series) and CGDIS fire-safety requirements apply.
Frequently asked questions
What can I build in Beaufort?
It depends on the PAG zone of your plot and on the PAP rules that apply there: height, number of storeys, setbacks, depth, number of dwellings. In Beaufort, the PAG in force is the Projet de version coordonnée [Dossier 02], septembre 2025 (vote CC 30.09.2025 ; PAG initial approuvé MI 23.08.2019). Enter your address in the Faire son Nid app to find your zone and plot.
Where can I find the PAG and PAP of Beaufort?
On the municipality’s website and on the national geoportal. Direct links to the documents in force are gathered on this page.
Do I need a building permit in Beaufort?
Yes, for any construction, extension, alteration or change of use. It is issued by the mayor of Beaufort; information: Service technique (atelier communal), 59 route de Dillingen, L-6315 Beaufort ; administration : 9 rue de l'Église, L-6315 Beaufort.
How much does a renovation cost in Beaufort?
As an order of magnitude in Luxembourg, allow €1,800–2,200 per m² excl. VAT for a basic full renovation, €3,150–3,850 for a heavy renovation and €4,000–4,500 for a high-end transformation, excluding VAT, fees and ancillary costs. The app’s simulator gives a range indexed on STATEC prices, with Klimabonus grants.